• Home
  • About Us
  • Gallery
  • Contact


Gallery of just a handful of projects we have done.

Enjoy!

Happy Scrolling!



Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed malesuada faucibus ex nec ultricies. Donec mattis egestas nisi non pretium. Suspendisse nec eros ut erat facilisis maximus. In congue et leo in varius. Vestibulum sit amet felis ornare, commodo orci ut, feugiat lorem.


No fun unless it's a challenge !!!!!



Out with the old and in with the new !!!! A bit tight but a 1/4" is as good as a mile.



Installation of a robotic welder.



The customer figures out where they want it, Castle figures out how to get it there. We can put manufacturing equipment in large facilities or in your game room at home.



Not all of our work is dirty!!!!
Paint booth install with a long duct run, 200' of 4' duct 50' in the air.



Load them up and pack it in.



Castle is always up for a good challenge. 55' industrial open top paint booth relocation. We moved this 55' long X 20' wide X 14' high industrial paint booth with no ceiling or roof let alone any kind of roof structure in 1 piece approximately 130'.



Up and Over



Load, transport and unload of a 60,000# specialty machine.



Field modifications: shorten it up.
Got to make space for new equipment.



Just another day at the office!!
Some times a nice view can help clear the mind.
We got lucky to get roof penetration and stack installed on a clear day.



Well, I'm not crazy about it, but he talked me into it.
Castle Service is involved with it's first International project and off he goes to Germany. Good Luck, Buddy!!!! Safe travels!



Installation of a 56,000# vertical CNC mill.
Unloading machine off of a specialized trailer, uncrating machine, loading onto a triaxle truck to back up to a dock height door, unload machine, move it through a tight area and set into place at a local manufacturing facility.



Lifted, loaded and tarped!!!



Challenging Vertical Boring Mill Install.



State of the Art Laser Tube Installation



Tight was not the word for it.
Another horizontal machining center in an internal dock.



Almost needed a bigger door or a smaller machine.



Moving a 44k# horizontal machining center in through an internal dock



Loading of 56k# Vertical Turret Lathe



New 65,000# press brake
Unloaded, unskidded, and set in place at a new manufacturing facility



Up and Over



Flying iron in Johnstown, PA
Installation of a steel structure to support a large air handling unit.



5-ton overhead crane and runway removal



Looks like we got our work cut out. Four trailer loads of a new laser.



The projects we get ourselves into. Old concrete stair removal and new steel stair install with new concrete pad.



Thru the woods and off to a customer's house we go!!!



Lay down the old and Stand up the New.
45,000# press removal and install



Sometimes if it's too high, you gotta lay it down and stand it back up.
18,000# press install



62,000# long bed CNC lathe install



52,000# Vertical Boring Mill Install



Installing state of the art equipment to manufacture state of the art robots. 48,000# Mill Turn
20,000# 5 axis Mill



We were told it would fit.
Good thing they didn't put 2 coats of paint on the machine.



Some days can be more interesting than others.



CSI is on the scene.
Complete manufacturing line installation.



It's amazing where you can hide electrical equipment.
Getting it there can be a challenge at times.
Don't look like much but weighs 4000#.



Turnkey New machine removal and transportation





PO Box 52, West Newton, Pa 15089



© 2022 - 2025 | All Rights Reserved |